What's in an ESC Monitoring Report?

A walkthrough of a typical erosion and sediment control monitoring report: site conditions, water quality readings, deficiencies, photos and corrective actions.

By SiteWater · Registered Professional Biologist (R.P.Bio.) ·

After each visit you receive a signed ESC monitoring report. Here’s what it contains and why each section matters.

1. Project and visit details

Site address, permit number, date and time of inspection, weather in the past 24 hours and at the time of the visit, and the inspector’s name and designation.

2. Site conditions

Construction phase, areas of exposed soil, stockpiles, active excavation or dewatering, and any changes since the last visit.

3. Comparison against the ESC plan

Whether each control shown on the approved ESC plan is installed, functioning and maintained, and whether site changes have created a need for new controls.

4. Discharge observations and water quality

Whether the site was discharging at the time of the visit, where, and what the water looked like. If water quality testing is included, readings for turbidity, pH, temperature and conductivity at discharge and background locations, with instrument calibration details.

5. Deficiencies and corrective actions

A numbered list of problems, each with a photo, location and recommended fix, prioritized by risk. Items carried over from previous reports are tracked until closed.

6. Photo log and sign-off

Representative photos of the site and controls, and the professional’s signature.

Many municipalities publish templates or minimum content requirements, and we follow them where they apply. See our ESC inspection service.

Need ESC monitoring?

SiteWater provides ESC inspections and water quality testing in 16 Lower Mainland municipalities. Packages from $289 per visit.

More guides

Need an ESC inspection this week?

Text 778-554-4465 or email us through the contact form for a free quote. Flat pricing, reply within one business day.