Do I Need an Environmental Monitor for My Building Permit?
When Lower Mainland homeowners and builders need an independent ESC or environmental monitor, and what qualifications municipalities look for.
If your building or development permit includes erosion and sediment control conditions, you’ll likely need an independent monitor to inspect the site and report on it. This applies to more projects than many homeowners expect, including single-family rebuilds and laneway houses.
Signs you need one
- Your permit or approval letter mentions an ESC plan, ESC monitoring, a sediment control system or an environmental monitor.
- The city asked for a security deposit tied to sediment control.
- Your site is near a creek, ravine, wetland or shoreline.
- You’ll be dewatering an excavation.
What qualifications are required?
Requirements vary by municipality. Commonly accepted qualifications include registered professionals such as a Registered Professional Biologist (R.P.Bio.), professional engineers and geoscientists, applied science technologists, and certified ESC inspectors. The key requirement in most cities is that the monitor is qualified and independent of the contractor.
What does it cost?
Monitoring is typically charged per visit. SiteWater’s ESC inspections start at a flat per-inspection rate, and our combined ESC + water testing package offers the best value for sites that need both.
Not sure what your permit requires? Send it to us and we’ll tell you what’s needed.
Need ESC monitoring?
SiteWater provides ESC inspections and water quality testing in 16 Lower Mainland municipalities. Packages from $289 per visit.