Dewatering Discharge Monitoring on Construction Sites
How to manage and monitor excavation dewatering discharge in Metro Vancouver: settling, turbidity and pH checks, TSS sampling and record keeping.
Excavations in the Lower Mainland often fill with groundwater or rain, especially in low-lying areas like Richmond, Delta and Pitt Meadows. Pumping that water out is dewatering, and where it goes matters.
Why dewatering needs monitoring
Pumped water is usually loaded with fine sediment. Sent straight to a catch basin, it can turn a storm drain or creek brown for kilometres. Municipalities commonly regulate dewatering discharge through permit conditions, and discharging to the sanitary sewer may require a separate regional approval.
Good practice
- Settle first. Pump to a settling tank, baffled bin or sediment bag before discharge.
- Discharge to the approved location, never to a ditch or street without permission.
- Measure turbidity and pH at the discharge point and compare with your permit threshold.
- Sample for TSS if your approval requires laboratory results.
- Keep records of flow, readings, times and corrective actions.
How we help
We provide on-site water quality testing, laboratory TSS sampling and practical advice on settling and filtration setups.
Need ESC monitoring?
SiteWater provides ESC inspections and water quality testing in 16 Lower Mainland municipalities. Packages from $289 per visit.