ESC & Water Quality Glossary

The terms you'll see in permits, ESC plans and monitoring reports, explained.

Background (upstream) sample
A reading or sample taken from the receiving water upstream of a site, or from water unaffected by it, used to judge how much the site changes water quality.
Catch basin / inlet protection
A filter bag, insert or barrier that keeps sediment out of storm drain inlets on or near a site. It’s one of the most commonly deficient controls.
Chain of custody
A signed record of who collected, handled and delivered a water sample, which keeps laboratory results defensible.
Check dam
A small barrier of rock, sandbags or logs placed across a ditch or swale to slow water and let sediment settle.
Conductivity
How well water conducts electricity, which reflects dissolved salts and other ions. Sudden changes can flag contamination or saltwater influence.
Dewatering
Pumping groundwater or rainwater out of an excavation. Discharge usually needs settling or treatment and monitoring before it reaches a storm drain.
Dissolved oxygen (DO)
The amount of oxygen dissolved in water, in mg/L. Fish and aquatic insects need adequate DO to survive.
Erosion and sediment control (ESC)
The practices that keep soil in place (erosion control) and capture soil that does move (sediment control) on construction sites.
ESC plan
Drawings and notes, usually approved by the municipality, showing which controls will be installed on a site and how they will be maintained.
Erosion blanket
A biodegradable or synthetic mat laid on exposed slopes to protect soil from rain until vegetation grows.
Grab sample
A single water sample collected at one place and time, as opposed to a composite sample made from several.
NTU (nephelometric turbidity unit)
The unit for turbidity, measured with a turbidimeter that detects light scattered by particles in water.
pH
A measure of acidity or alkalinity from 0 to 14, where 7 is neutral. Concrete and cement work can make runoff strongly alkaline (high pH).
R.P.Bio. (Registered Professional Biologist)
A professional designation in British Columbia granted by the College of Applied Biology.
Receiving water
The creek, river, lake, wetland or ocean that a site’s runoff ultimately reaches, often through the storm sewer.
Sediment pond / tank
A basin or tank where muddy water is held so sediment can settle before the water is discharged.
Silt fence
A geotextile fence trenched into the ground along a site’s downhill edge to trap sediment in runoff.
Stabilized construction entrance
A pad of coarse rock or rumble plates at a site exit that knocks mud off vehicle tires and reduces tracking onto roads.
Total suspended solids (TSS)
The dry weight of particles filtered from a known volume of water, reported in mg/L and measured in a laboratory.
Turbidity
The cloudiness of water caused by suspended particles. It’s the most common field indicator of sediment in construction discharge.
Wet season
In the Lower Mainland, roughly October through April, when most rain falls and ESC monitoring requirements are usually most frequent.

Want to see these terms in practice? Read what’s in an ESC monitoring report or browse all guides.

Need an ESC inspection this week?

Text 778-554-4465 or email us through the contact form for a free quote. Flat pricing, reply within one business day.